Fuss & O’Neill Construction Services was contracted by Bridgeport Hospital for the replacement of two 25,000-gallon underground storage tanks (USTs) with new 25,000-gallon double wall aboveground storage tanks (ASTs).
Due to the size of the new ASTs and the proximity of a retaining wall supporting the tank area from a hospital access-way/loading dock, a sizable structural concrete foundation was installed prior to tank installation.
New ASTs were installed partially below existing grade inside a concrete containment structure.