Schweizer Aircraft Corporation Engineering Services

Fuss & O’Neill has been assisting Schweizer Aircraft Corporation with numerous projects since 2004.

We have provided due diligence auditing and support and prepared SWPPP, SPCC, and an RCRA Integrated Contingency Plan for the facility. We managed construction of proposed secondary containment upgrades under a $240,000 design/build arrangement.

Regarding environmental services, we provided on-call environmental compliance assistance and provided technical assistance and support during negotiations for the facility’s industrial wastewater compliance with EPA pretreatment program inspections.

We assisted with regulatory review of testing requirements for their existing above ground storage tanks and prepared engineering drawings for additional secondary containment designs around petroleum storage areas.