US Route 2 over Lake Champlain Bridge Design

This project included preliminary investigations and final design of bridge rehabilitation and a membrane replacement on this 4,050-foot-long bridge between Vermont and the State of New York.

Joint replacements were included in the project with joints capable of up to 10 inches of movement detailed. Concrete deck repairs, parapet joint repairs, and concrete waterproofing were also included. Fuss & O’Neill developed preliminary and final design plans, quantity takeoffs, estimate, and work zone traffic control plans for the project. Fuss & O’Neill also performed a study of alternate bridge deck membranes that could be driven on before being paved over.