RIDOT Stormwater On-Call Services

Fuss & O’Neill is currently providing on-call stormwater services to assist RIDOT in complying with their USEPA Consent Decree. This Consent Decree requires that RIDOT plan, develop, implement and maintain controls to reduce stormwater impacts to receiving water quality. This includes specifically addressing TMDLs and water quality impairments. Intial estimates are that implementation of this program will cost about $110 million.

Current assignments that Fuss & O’Neill is completing include:
RIDOT Linear Stormwater Manual. We are currently preparing a manual that details the planning, design, construction and maintenance of a range of stormwater controls that could be implemented within a road right-of-way. Lower Woonasquatucket River: We are currently conducting a feasibility study of potential stormwater controls proposed within the City of Providence portion of the Lower Woonasquatucket Watershed. Upper Woonasquatuctek River: We are currently preparing a stormwater control plan for this watershed.